‘Veja Mate’ is the second wind farm to realize after “BARD Offshore 1”. The first 40 wind turbines in the ‘Veja Mate’ wind power station should be connected to the grid at the end of 2011. The wind farm will be in the west of the German Bight in the southeastern North Sea within Germany’s Exclusive Economic Zone. The site is northwest of the island of Borkum and around 129 kilometres northwest of Helgoland. A total of 80 'BARD 5.0' wind turbines will be installed in an area of 50 square kilometres in 39-41 metres of water. In the east the wind farm borders the ‘BARD Offshore 1’ wind farm, which will be in operation by then.

Project area of ‚Veja Mate’
|