Startseite » Concept » WEC » Foundation

Foundation

Our ‘Tripile’ foundation system has been patented and is produced in series by our subsidiary Cuxhaven Steel Construction GmbH in Cuxhaven.  It is suitable for water depths of 25 to around 40 metres and is compacter, lighter and cheaper than other offshore foundation systems.  The supporting crosspiece and struts are welded from flat steel elements.  The joins between the supporting crosspiece and the three foundation piles are glued with special cement.  All the assembly work can be done with the heavy-duty crane on our construction vessel.

Installation of the “BARD Tripile” for the “BARD Nearshore Hooksiel” (BNH)