Startseite » Concept » Installation » Jack-Up-Barge

Jack-Up-Barge

We use our own self-propelled jack-up platforms with onboard heavy-duty crane to build our offshore wind farms and to carry out service and maintenance. 

This means that we possess the key tool for building a wind farm.  Having our own jack-up platform makes us flexible and gives us the time leeway we need for installation and operation.  The ‘Wind Lift I’ provides a secure, stable work platform even with wave heights in excess of 3 metres and up to wind force 7.  It has a helicopter landing deck and offers accommodation for up to 50 people.


 

Technical Data – „BARD Wind Lift I“
Length over all 101,80 m
Width 36 m
Draft 3,5 m
Max. Water depth for Jack-Up- operation 45 m
Cargo ca. 2.600 t
Ship occupancy 50 Persons

Main crane

Height above main deck 121 m
Crane load 500 t @ 31 m